A & N Electric Cooperative
Your Electric Bill
Reading your Meter
Rates
Connection & Disconnection
Member Services
Payment Options

Latest News About ANEC

Jobs at ANEC

Bill Payment and Meter Reading

Board of Directors

About Us

Our Staff

Energy Tips

Outages

Capital Credits

Engineering

Operations

Home
Your Electric Bill

Rates & Miscellaneous Charges

These rate schedules have been approved by the State Corporation Commission of Virginia.

The wholesale power supplier we purchase power from adds fuel charges and power costs which we must add to the ANEC base rate. These extra charges are added on each kilowatt-hour for every member. They are collected from the members and passed on to the power supplier. None of the extra charges stay at ANEC.

Adobe Acrobat Reader
The rates schedules below are stored in Adobe® Acrobat® Reader® format. (Note that most browsers have it preinstalled.)

Rate Schedules
Farm and Home Service – Schedule A-U ( PDF Document 42 KB)

Farm and Home Service – Retail Access – Schedule A-U-RA ( PDF Document 44 KB)


Commercial and Industrial Service – Schedule B-U ( PDF Document 41 KB)

Commercial and Industrial Service – Retail Access – Schedule B-U-RA ( PDF Document 44 KB)


Irrigation Service – Schedule I-U ( PDF Document 74 KB)

Irrigation Service – Load Management – Schedule I-LM-U ( PDF Document 91 KB)

Irrigation Service – Retail Access – Schedule I-U-RA ( PDF Document 78 KB)


Large Power – Schedule LP-A-U ( PDF Document 167 KB)

Large Power – High Load Factor – Schedule LP-B-U ( PDF Document 177 KB)

Large Power – High Load Factor – Retail Access – Schedule LP-B-U-RA ( PDF Document 134 KB)

Large Power – Low Load Factor – Schedule LP-C-U ( PDF Document 194 KB)

Large Power – Low Load Factor – Retail Access – Schedule LP-C-U-RA ( PDF Document 140 KB)

Net Energy Metering Rider – Schedule NEM-4 ( PDF Document 127 KB)

Former Delmarva Power Territory
Residential Service – Schedule "AST R" ( PDF Document 94 KB)

Optional Residential Time-Of-Use Non Demand-Metered Rate – Schedule "AST R-TOU-ND" ( PDF Document 97 KB)

Private Area Lighting – Schedule "AST PL" ( PDF Document 607 KB)

Outdoor Recreational Lighting Rate – Schedule "AST ORL" ( PDF Document 82 KB)

Small General Service – Secondary Rate – Schedule "AST SGS-S" ( PDF Document 114 KB)

General Service – Primary Rate – Schedule "AST GS-P" ( PDF Document 166 KB)

Public Lighting Service (Street Lighting, Traffic Signals, and Directional Signs) – Schedule "AST SL" ( PDF Document 184 KB)

Large General Service – Secondary Rate – Schedule "AST LGS-S" ( PDF Document 165 KB)

Energy for Tomorrow – Rider "AST EFT" ( PDF Document 105 KB)

FEES

Membership Fee – Initial Service Connection (Refundable) $5.00
Connection or Transfer Fee (Non-Refundable) $20.00
Seasonal Connection Fee $40.00
Service Charge for Reading Meter $6.00
Reconnection Fee to Existing Consumer:
     During regular working hours, per trip, per account $40.00
     After regular working hours at customer's request, per trip, per account $60.00
Collection Fee – applicable if field visit for collection is made $20.00
Return Payment Processing Fee (payment not honored by financial institution) $15.00
Monthly Meter Reading Fee $2.00


Reconnect Fee
If electric service has been disconnected for nonpayment, there is a $40.00 reconnect fee added to the total amount due on the bill. If the service is reconnected after hours or on a weekend or holiday, a reconnect fee of $60.00 is added to the total bill. A deposit may be required in addition to these fees.

Meter Reading
For ANEC consumers who are required to read their own meters - if a reading is not furnished for two consecutive months, reading will be taken by ANEC the third month and a $6.00 charge will be made for this service. Should the Cooperative have to read a meter twice within a twelve month period or should you prefer the cooperative to electronically read your meter, an electronic meter capable of remote readings may be installed and a monthly fee of $2.00 shall be charged.

(This does not apply to accounts located in the former Delmarva Power service territory.)

Returned Check
If a check is returned to ANEC unpaid by a bank, a $15.00 charge is made plus the amount of the check. This must be paid in cash or by money order.

Collection Charge
If an employee makes a trip to a member's house to collect a delinquent bill, a $20.00 collection charge is added to the amount of the past due bill. Should Cooperative personnel have to visit an account for collection twice within a twelve month period, an electronic connect/disconnect meter may be installed. This meter will allow the Cooperative to remotely connect and disconnect and obtain meter readings. This meter shall remain in place for at least twelve months and will not be removed until the consumer requests removal. The charge for this service shall be $2.00 monthly.


top of page


Latest News     Bill Payment & Meter Reading     Board of Directors     Our Staff     Energy Tips     Outages     Billing     Capital Credits     Engineering     Operations     Home Page



A & N Electric Cooperative
P. O. Box 290
21275 Cooperative Way
Tasley, VA 23441
Phone: 757-787-9750
Toll-Free: 800-431-2632
Fax: 757-787-9780
Contact Us!



Copyright © 1999-2009, A & N Electric Cooperative